South End Bikeway Connector Rumbles Along – Cont’d (12/26/19)

Looking south to work-in-progress connecting the trailhead/parking to the cycle track on S. Pearl St. (The traffic light is at Old S. Pearl St.)

OLYMPUS DIGITAL CAMERA

The new CDTA pickup at the north end of the Pearl St. segment of the cycle track (just visible behind the booth).  Ezra Prentiss homes at the far right.

OLYMPUS DIGITAL CAMERA

Those big, stinking, noisy, fuming trucks still very much part of the daily scene – and notably traveling above the speed limit.

The end of the cycle track on the north end of Frontage Rd. at Church St./Vine St. (Tank bombs to the left.)

OLYMPUS DIGITAL CAMERA

Leave a comment

Filed under Albany County Rail Trail, Albany Riverfront Park, City Review, South End Bikeway Connector

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s