Monthly Archives: October 2015

Parking Day in the City of Albany ~ PBLs Forever!

Green Lane in Albany – Fri, 9/18/15, 11 AM – 4 PM

The Protected Bicycle Lane Coalition and Albany Bicycle Coalition coordinated on a Protected Bicycle Lanes demonstration project as part of “Parking Day” in the City of Albany. Our exhibit was coordinated with Parks & Trails New York that had a campsite set up just at the end of the PBL green lane. This suggests that acceptable in-city facilities for people on bicycles will enhance there access to parks and trails that surround our urban areas.  PTNY was also promoting its “Close the Gaps” initiative to have all on-road portions of the Erie Canalway Trail replace by trails for by the time of the bicentennial of the beginning of Erie Canal construction – July 4, 2017.

“Parking Day” is to illustrate alternative uses for street space – uses other than as a tax-subsidized, frequently free place for people to store their motor vehicles.

The Details:

Thanks to Jim’s inventive genius and Rossana’s artistry with sidewalk chalk, ABC+PBLC had a credible full-scale Protected Bicycle Lane demonstration project on Washington Ave. on Parking Day, 9/18/15.

From 11 AM until around 3:30 PM, Claire, Jim, and Rossana were on duty to greet the visitors and explain how PBLs “work.” We were impressed with the number of positive comments – “way to go,” “I agree with this,” “good idea,” “when are we going to have these in Albany,” and so on from the many passersby.

We also noted several questions about the new Albany County Helderberg-Hudson Rail Trail and how it will be accessed from Delmar, Voorheesville, and Albany.

Photos Below –

Official schedule:

  • Friday
  • September 18
  • Event: 11 am – 4 pm

#1 – Jim demonstrating his “Mark I – Corn Starch Lane Builder.” We experimented with different exit hole sizes in the trough. Several passes were need followed by a gentle brooming to get the material spread evenly and into the surface depressions.

Mark I – Corn Starch Lane Builder

Mark I – Corn Starch Lane Builder

#2 – The full lane covering three parking spaces of about 20 ft each.

5-ft lane with buffer

5-ft lane with buffer

#3 – Rossana tries out the PBL – so secure that she felt no need for a helmet. Note entryway. The lane is “NATCO-regulation” 5 ft wide with a 3 ft buffer consisting of paint (chalk) and PVC delimiters. (As a result, we are just outside the 7 ft. Albany standard parking lane.

OLYMPUS DIGITAL CAMERA

Trail Run!

#4 – After a relaxed, safe ride, Rossana arrives at her camping place, courtesy of Parks & Trails New York and just in time for the ever-vigilant Time Warner Cable News reporter to record this first-time event in Albany.

OLYMPUS DIGITAL CAMERA

Safe Arrival at Camp

Leave a comment

Filed under Activism, protected bicycle lanes

Close the Gaps Ride

Close the Gaps Ride – The Bike Barn Cycles and Parks & Trails New York collaborated on a “Close the Gaps” ride on 9/22/15. PTNY runs the annual Cycle the Erie Canal bike tour and advocates for finishing the 360-mile Erie Canalway Trail from Buffalo to Albany. The trail is 78 percent complete as an off-road trail. There are still critical sections that need to be closed – including Broadway in Watervliet. When the gaps are finished, the Erie Canalway Trail will be the longest of its kind in the country – with safe, enjoyable bicycling and hiking from one side of New York to the other.

Parks & Trails have collected postcards from trail riders over the past year asking the Governor and other decision makers to Close the Gaps. They plan to drop them off at the Capitol after the ride. They’ll have cards at the start for you to sign one and plan to take a group photo at the pedestrian bridge in Albany.

PTNY also provided snacks at the pedestrian bridge. Be sure to check out those Bike Barn riding shirts.

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

Bike Barn Cycles

Leave a comment

Filed under Activisim